WLE Mekong
  • About Us
    • About us
      • Our objectives
      • Our team
      • Contact us
    • Our partners
        • Cambodian Partners
        • Chinese Partners
        • International Partners
        • Lao Partners
        • Myanmar Partners
        • Thai Partners
        • Vietnamese Partners
    • Close
  • Changes
    • Where We Work
      • Irrawaddy River Basin
      • Mekong River Basin
      • Red River Basin
      • Salween River Basin
      • View all projects
    • Our Work
      • Benefit-sharing
      • Catchments & Landuse
      • Gender & Diversity
      • Research for Development
      • River Food Systems
      • River Monitoring
      • Water Governance
      • Capacity Building & Professional Development
    • Our Research
      • Greater Mekong Dams Observatory
      • State of Knowledge Series
      • Water Knowledge Series
      • Irrawaddy River Basin
      • Mekong River Basin
      • Red River Basin
      • Salween River Basin
    • Close
  • Dialogue
    • Stories
      • Irrawaddy River Basin
      • Mekong River Basin
      • Red River Basin
      • Salween River Basin
      • Mekong Citizen
    • Greater Mekong Fora
      • 2018 Greater Mekong Forum
      • 2017 Greater Mekong Forum
      • 2016 Greater Mekong Forum
      • 2015 Greater Mekong Forum
    • Close

Mekong Blog

  • Mekong River Basin

Don Sahong fish studies will continue

  • Stories
  • Greater Mekong Forums
  • Mekong Citizen

Don Sahong fish studies will continue

MiaMarch 25, 2015Mekong River Basin, News from the Greater Mekong Region, Vientiane Times

Vientiane Times, February 14, 2015 The developer of the Don Sahong Hydropower Project has said channel modification and monitoring of fish species and fish passages in the Siphandone area will continue as preparations are made to start construction.  The Lao PDR recently told the Mekong River Commission (MRC) that it is ending the formal six-month Prior Consultation process and plans to move ahead with construction of the 260-MW Don Sahong Project. Excavation is being done in Hou Wai to provide a wider and deeper channel for large fish to move upstream past the Khone Larn rapids in the dry season, as well as modifications to the existing channel to improve the passage for smaller fish species.  This work will ensure that there is an effective upstream passage route for all fish species past the main barrier in Hou Xang Pheuak. Journalists who visited the channel-widening project this month saw many birds hunting for food, a sign that small fish were already plentiful.  In addition to widening and deepening channels adjacent to Hou Sahong, scientific studies of the fish species and the local fishery will continue.  Among the ongoing activities is catch-per-unit-effort (CPUE) sampling at upstream and downstream sites in various fish passage channels near Hou Sahong, the channel which would be blocked by the project.  Another is the household catch survey in which 60 households in six villages have been recording their catches daily to reflect the socioeconomic importance of the fish catch. The results of the household survey also tell scientists about fish migration patterns.  Mr Kent Hortle, an independent consultant for Don Sahong Power Company, said the geography of the Khone Falls area is characterised by its many channels and seasonal changes in water flows. In addition, there is a great diversity of fish, with more than 200 species identified. Some species migrate past the falls at certain times of year.  Before the project began its studies in 2006, most of fisheries data came from 1994-1999 studies of catches by locals fishing downstream of the falls.  “Most quantitative information on Khone Falls fisheries is out-of-date and tells us only that fish are caught and killed in large quantities while trying to ascend the falls,” he said. “Many breeding fish are killed while migrating – before they can spawn. But there are no quantitative data on the proportions of fish that get past the falls (in total) or on the proportion that passes each channel at present. Nobody can quantify fisheries losses at this stage.”  Mr Hortle said the Don Sahong project has done what was initially required by the MRC by developing methods to evaluate the effectiveness of fish passage mitigation measures for upstream-migrating fish and to provide information for ongoing fish passage improvement.  In addition, the project has been evaluating risk to downstream-migrating fish and providing information needed to develop downstream fish passage mitigation measures. A third mandate is for the developer to gauge the socio-economic importance and value of the fisheries to the people directly affected by the project.  Rather than build any man-made fish ladders, the Don Sahong project is relying on natural channels to provide passage for fish once the Hou Sahong is blocked. Working with local residents, the project team has improved fish passage at four places, one in Hou Sadam and three in Hou Xang Pheuak.  In recent weeks, fish can be seen moving upstream through the improved fish passages and feeding within them.

Previous
Story
Next
Story

Related Stories

  • mekong
    March 12, 2014
    Laos welcomes comments on Don Sahong dam
  • irrawaddy mekong salween
    October 15, 2015
    Strategic Environmental Assessments: A Call To Share Your Experiences
    Water Governance
  • mekong
    June 14, 2013
    IFC helps Laos to revise water law
  • mekong
    January 22, 2013
    Theun-Hinboun hydro expansion project powers up
  • mekong
    October 30, 2013
    Chinese 'dam art'
  • mekong
    April 23, 2014
    Nam Xong water management gives hope for other basins
  • mekong
    May 14, 2013
    Learning by Seeing
  • mekong
    February 20, 2014
    Luang Prabang hydropower development to surge
  • mekong
    February 2, 2015
    World Bank and International Hydropower Association to promote sustainable hydropower ...
  • mekong
    April 24, 2014
    Study documents being processed for Nam Theun 2 expansion
  • mekong
    May 15, 2014
    Survey to develop fisheries resources in Laos
  • mekong
    June 20, 2018
    Science-policy collaboration: an appealing way to tackle pollution from bananas
    Water Governance
  • mekong
    August 25, 2013
    Conserving biodiversity, sustaining Mekong livelihoods
  • mekong
    March 7, 2013
    Denying green development is deplorable: hydropower helps us all
  • mekong
    July 12, 2013
    Laos commits to follow Mekong agreement
  • mekong
    December 5, 2013
    Xe Pian Xe Namnoy hydropower construction set to begin
    Water Governance
  • irrawaddy mekong red
    August 24, 2012
    River Basin Games
    Research for Development | Water Governance
  • mekong
    December 4, 2012
    Nam Khan II power plant has carbon offset potential
  • mekong red
    February 24, 2015
    WLE Mekong Project Introductions
  • mekong
    May 15, 2014
    Xayabury dam can withstand big earthquakes, engineer says

The sustainable development of the Greater Mekong depends on the fair and equitable governance of its water.

ABOUT WLE

  • Our objectives
  • Our team
  • Our partners
  • Terms of use
  • Newsletters
  • Contact us

CO-SUPPORTED BY

WLE Greater Mekong is funded in part by the Australian Department of Foreign Affairs and Trade (DFAT).

Water, Land & Ecosystems Mekong - footer logos
© All rights reserved - WLE CGIAR
Subscribe to our newsletter SIGN UP
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.OkPrivacy policy